STOCKHEAD: Firefinch has updated the definitive feasibility study (DFS) for the Goulamina Lithium project in Mali, West Africa, with annualised spodumene concentrate production of 506,000 tonnes increasing to a peak of 880,000 tonnes.
Previous PostGoulamina a 'goer' with great lithium numbers for Firefinch and Ganfeng
Next PostFirefinch updates Goulamina Lithium Project DFS, delivering NPV of A$4.1 billion and 83% IRR